XOps removes the routine workload from crew planning and scheduling, supports the operation through disruption and short-notice demand, and gives Flight Operations and the CEO a single, current view of the company. Built for ACMI operations.
Live data from your scheduling system, presented as one operational status board and one executive briefing. Around it, the working tools of each department and decision support for disruption recovery, short-notice flying and commercial requests.
Book a demonstration
Not a replacement for your crew planning department — the layer built on top of it. Routine work automated; operational judgement retained by your team.
An operational status board for the day and an executive briefing for the board, from the same live data — so the operational and commercial views reconcile.
Tail assignment within curfew, turnaround and maintenance constraints; aircraft and legal crew for short-notice flying; ranked, costed recovery options for AOG, delay and crew unavailability.
The full month crewed from the schedule alone, for ACMI duty patterns; an existing roster improved towards a chosen objective — annual-hours balance, coverage, fatigue or cost; every result compared seat by seat with the published roster, every open seat attributed to the rule that refused it.
A request for quote becomes a ranked decision package. Every decision passes through one approvals ledger and reaches the crew app and your scheduling system only as approved drafts.
Extended tours away from base. Crew resident in one country operating from another. Four sectors per tail-day handed between two crews at the hub. The engine models these patterns directly and applies ORO.FTL limits during construction, not after.
Operational and commercial views from the same live data.
Decision support for disruption, short-notice flying and RFQs — when it is needed.
Tours, crew away from base and positioning modelled as first-class constraints.
Constructed from the schedule alone, ORO.FTL applied during the build, every open seat attributed.
Annual-hours balance, coverage, fatigue or cost — never below current coverage.
Curfews, turnarounds, maintenance windows and one crew per aircraft in one plan.
Feasibility, costing and ranking of every RFQ before planning time is committed.
Duties, acknowledgements, bids and protected days off, published to the crew app.
EASA, FAA Part 117 and UK CAP 371 built in; OM-A limits added without code.
A named signature on every change reaching crew or the scheduling system.
A current view of the operation. A roster built for ACMI duty patterns. One record that Flight Operations, planning and the CEO can all sign.
Book a demonstration